LLGA · Course notes

Startup, Large Companies & Entrepreneurship

Management course · notes kept for reference; 2026–27 replacements IME_52441_EP and IME_52470_EP

Contents

Module Startup, Large Companies & Entrepreneurship
Period M1 · Period 2 in the earlier wiki curriculum
ECTS — (per semester offer)
Status Notes kept for reference Not in the LLGA 2026–2027 list; replaced by IME_52441_EP and IME_52470_EP

Stakes (Extrapolating)

Not in the LLGA 2026–2027 list. In 2026–2027 the Period 2 management units of the track are IME_52441_EP — Simulation d’entreprise, a one-day serious game in which teams of five run competing multinational phone makers (R&D, plant sizing, pricing, accounting, responsible-sourcing trade-offs), and IME_52470_EP — Digital Transformation and AI in Organisations and Society (Daniel Curto), on how AI systems reshape organisations, work and decision-making once they leave the lab (group project and individual exam).

The startup/entrepreneurship pair below comes from the earlier wiki curriculum and is kept as background. Extrapolated notes. Brochure title: Startup and Large Companies: Building a Bridge for Innovation or Entrepreneurship for Sustainability / Case Studies on Innovation. Shared thread: how an innovation (often technical) crosses the startup ↔︎ large-company boundary under governance, risk, and sometimes sustainability constraints.

In the wiki curriculum, the pair followed P1 strategy/marketing with cases: alliances, scaling, and friction between startup speed and corporate process — very visible when industrializing an AI model. The official case material is not reproduced here; one illustrative case shows the reasoning on a Period 2 demo.

Place in the 2-year path

Upstream: Strategy / Marketing. Here (P2 in the wiki curriculum): applied innovation during the RL / Graph ML / NLP core; in 2026–2027 the Period 2 management slot is held by IME_52441_EP and IME_52470_EP. Downstream: P3 research internship, then M2 transverse project + final internship.

Industry and research links

Industry: intrapreneurship, corporate venture, tech transfer, AI product ops. Research: result maturity (TRL), IP, open-source vs proprietary — recurring in lab internships and CIFRE.

A worked case: the graph+text demo

Illustrative An invented scenario, with no real company behind it. It applies the bridge questions of How to approach it to one Period 2 deliverable.

The demo. A student team has built the question-answering system of capstone Y1.1: text becomes a knowledge graph (NLP), a retriever walks the graph (Graph ML), a bandit learns which retrieval mode is worth its token cost (RL), and an LLM writes the answer with its sources. A mid-size industrial company wants it for its maintenance manuals. One team member would rather found a startup around it.

Step 1 — Who pays, who uses, who operates.

Step 2 — Maturity. On the technology readiness level (TRL) scale, the demo is at TRL 4: validated in the lab, on a public proxy corpus. Run on the company’s own manuals, it reaches TRL 5–6 (validated, then demonstrated, in a relevant environment). A pilot used by technicians in the workshop is TRL 7. The gap is work the demo skipped: per-document access rights, refreshing the graph when a manual changes, and a test set written with technicians.

Step 3 — Risk register.

Step 4 — Two routes.

Spin-off startup Corporate pilot (intrapreneurship)
Speed Weeks to a first pilot Months: purchasing, security review, legal
Money Founders’ time, grants, then a seed round An internal budget and a sponsoring manager
Who owns the IP The startup, under a licence from the school or lab if needed The company, as the contract says
Main risk One customer and no second source of revenue The pilot never leaves the innovation lab
Success looks like A second paying customer The system enters the IT run budget

Step 5 — Cost check. Take requests the size of the worked example in MLOps ch. 4, a Year 2 course: 1,500 tokens in and 300 out, at its illustrative API prices.

What the case teaches. The model was the easy part. The bridge is decided by who signs the run budget after the pilot, who answers for a wrong answer, and whether the data may leave the building.

How to approach it

Extrapolating Framing support; the case above is illustrative, and official cases and grading belong to the course units actually taught (in 2026–2027, IME_52441_EP and IME_52470_EP).